The renovation of the Krammer Locks is a major infrastructure project within the Dutch Delta Works flood-defence system and a vital link in the Rotterdam-Antwerp-Paris inland shipping route. After more than 35 years of operation, the lock complex requires comprehensive modernization.
In this case study, you will discover how Relatics supports ZEEKR in managing system complexity, coordinating multidisciplinary interfaces, and maintaining control throughout the lifecycle of the Krammer Locks renovation.

