Project Control Noord/Zuidlijn with Relatics by ON and OG

In this presentation, a picture is sketched how the client and the contractor are using Relatics as a project management tool for this complex and prestigious project. These include requirements management, verification structure scenarios, Audits, Safety Case Management and Monitor.

Presentation (in Dutch)


About the authors

Adriaan den Hartogh has been working at Arcadis Netherlands since 2012 in the field of Urban transport. For 3 years he has been a consultant Systems Engineer at VIA Noord/Zuidlijn, where he supports the design and inspection, test and implementation team.

Cees van Leeuwen has been working at the project Noord/Zuidlijn since 2013. He supports the use of Relatics within the project teams on the client side. Both for end use as extensions to the various aspects of project management.

Articles about Requirements Management

Relatics main sponsor Incose Grande Finale

Relatics is official main sponsor of the INCOSE Grande Finale. INCOSE is a non-profit association, established in 1990, with the aim of promoting the application and development of Systems Engineering.

Read More

Rijkswaterstaat increases its Grip™ on flexibility with Relatics

What does information management in an infrastructure project and climbing a mountain have in common? At first glance, not much.  And yet Grip, a central application for storing, managing and unlocking all the project information 

Read More

Requirements Management

Relatics is a web-based tool used for Requirements Management in large construction, infrastructure and civil engineering projects. From the start of the project all information such as requirements, stakeholders, goals, design components, tests and documents is fully traceable. Project members get a grip on requirements as information is managed effectively, always remains traceable and because the…

Read More

World Solar Challenge door Solar Team Twente

Solar Team Twente participated in the Bridgestone World Solar Challenge in Australia in October 2015. Relatics played an important role in the daily way of working within the team. It in this presentation there is told about the experiences, the race and the connection between Relatics and Solar Team Twente. Presentation (in Dutch) About the author…

Read More

Project Control Noord/Zuidlijn with Relatics by ON and OG

In this presentation, a picture is sketched how the client and the contractor are using Relatics as a project management tool for this complex and prestigious project. These include requirements management, verification structure scenarios, Audits, Safety Case Management and Monitor. Presentation (in Dutch) About the authors Adriaan den Hartogh has been working at Arcadis Netherlands…

Read More

Save money and make the best design choices with Value Engineering

When performing information management on a project at first the project process and the resulting information needs, need to be looked at. This often shows that Relatics is not the only system in which information is recorded. However you would like to you capture the information only once in one place. This presentation shows how…

Read More

Applying Relatics effectively by integrating BIM and GIS

When performing informationmanagement on a project at first the project process and the resulting information needs should be looked at. It often turns out that Relatics is not the only system in which information is recorded. Still, you want to capture the information in one place only once. In this presentation some examples will be…

Read More

Complete contract management for construction of Maasvlakte 2

For the construction of Maasvlakte 2 Havenbedrijf Rotterdam searched for a way to completely trace the process including its interrelations inside the contract. Raymond van der Stelt mentions “after some research we found Relatics. The structured design of the database, the good intake of Relatics and the support during the configuration have resulted in a…

Read More

New Gotthard rail tunnel, built with Swiss precision

The world’s longest rail tunnel (57 km) right through the Gotthard Massif in Switzerland is intended to reduce the journey time from Zurich to Milan by one hour. After its opening next year, the train will offer an attractive alternative to the car and plane. The building consortium* ARGE Fahrbahn Transtec Gotthard (AFTTG) has designed…

Read More

Capturing verifications of requirements unambiguously

In high quality projects, verifications and tests are explicitly captured to be able to prove that the result meets the specifications. How verifications of requirements are described differs on the project and depends on the processes and needs. This article describes one of the possible ways to capture information about verifications. The examples in this article are…

Read More