books

In this article, experts discuss how Systems Engineering is applied in real construction projects, highlighting lessons learned and difficulties encountered over years of experience.

A digital construction world

The tender for the Second Coen Tunnel involved a new approach that also considered lifecycle processes. Although Ton Buijink was already familiar with the V-model from the rail sector, it was not yet entirely clear to him how to effectively deploy Systems Engineering. The most important lesson he picked up on this project was that you have to define information models properly right from the start. This way, you also lay a good foundation for further digitization.

Information models were also key during my time at construction firm BAM. They formed the basis for lifecycle management and digital construction. The idea is: make it, before you make it. By meticulously preparing projects digitally, you reduce the chance of mistakes during preparation and realization. I consider Systems Engineering and Relatics as fundamental building blocks for this.

Systems Engineering helps put the context in order. You have a structured overview of all relevant aspects, such as soil, permits and state of maintenance. When you get that right, you create the freedom to then be able to focus on the function. In practice, it is often still done the other way around. That means the context is not in order, which creates unnecessary risks in the project and offers too little freedom of solution for the project to be realized.

“With the Systems Engineering methodology, you get from concept to realization in a structured way, with everything now digitally recorded.”

Focus on efficiency

I do think it is prudent to be pragmatic. Initially, in their search, people tried to draw up the perfect Requirements Specification for the bid solicitation. If you make sure that client and contractor stay connected, you are much more decisive. Instead of the perfect solicitation, parties can engage in dialogue to find out exactly what is being asked, if there are still ambiguities. These days, the market is already much better at handling this.

This also applies to urge to have to demonstrate everything. In the beginning, this was done rather excessively, making project teams overly large. This made it more difficult to manage projects. As far as I am concerned, there should be a focus on efficiency here. With a small team, you can manage projects better.

Do you want to discover more lessons learned?

This article is part of a collection brought together in this book, based on interviews and practical experience from the construction industry.

Digital copies

In terms of digitization, I see interesting developments around digital twins. With the Systems Engineering methodology, you get from concept to realization in a structured way, with everything now digitally recorded. You have all kinds of meaningful relationships between different elements, such as requirements, interfaces and objects. By using visualization techniques, you are able to translate reality into the digital world and vice versa. Working in a digital copy is much easier than in the actual environment.

For example, if you want to widen a highway, you can remove that section of road from the model, modify it and put it back. That way you immediately get a good idea of all the interfaces and can easily optimize the design. Especially with the current complexity of many infrastructure projects, it is very functional if you can understand the impact of changes without already affecting the actual situation.

But even the existing built environment is already extensively digitized. In infrastructure projects, you can use that information very effectively. For instance, you can perfectly capture all above-ground and below-ground objects in a digital model and enrich them at the element level with all kinds of data, such as material, test and measurement data. In case of replacement, you then have an immediate picture of what is already present and what is needed.

It is good to see that the infrastructure sector remains curious about new developments. Systems Engineering has already played a stimulating role in this. Looking further ahead, I see plenty of opportunities for innovation in project support.

Lessons learned

  • Put pragmatism first and don’t get bogged down in perfectionism and completeness.
  • Invest in digital twins to minimize the risk of design errors.
  • Provide standard information models, making exchange between digital tools and systems much easier.
Biography

Ton Buijink

Ton Buijink studied Electrical Engineering and took the first steps in his career at NS and NedTrain Consulting. After that, he worked at engineering firm Arcadis. He then moved on to construction firm BAM PPP where he was tender and project manager. As director at BAM Infra, Buijink was involved in projects such as the Rotterdamsebaan, New Lock Terneuzen and various asset management contracts. In 2020, he joined contractor Ballast Nedam Infra as director. He was also president of the Dutch chapter of INCOSE.

Relatics - Pioneers in Systems Engineering

Pioneers in Systems Engineering
Insights and lessons learned from construction industry professionals.