books

In this article, experts discuss how Systems Engineering is applied in real construction projects, highlighting lessons learned and difficulties encountered over years of experience.

Gaining momentum

By the late nineties, it seems that the zeitgeist was ready for Systems Engineering. The structured project approach, where you set the requirements at the beginning, certainly appealed to Erik Klijn Velderman. He believes it is important to think carefully in advance about what you are going to build and how you approach it. The experiences that are becoming more and more mature in the ‘dry’ infrastructure within the civil engineering sector seem to also have value in the ‘wet corner’. This is evidenced by the boom in the application of Systems Engineering in the world of water boards.

The use of integrated contracts accelerated the development of Systems Engineering in the civil engineering sector. My first project was the A4 Burgerveen – Leiden. The question was how to approach functional specification effectively. Fortunately, the Dutch Systems Engineering Leidraad (‘guideline’) quickly provided guidance. A unique document that was created through dialogue between all parties involved to shape this development together.

“In practice, I often see that Systems Engineering is exclusively used as a contractual tool. However, I think you should start working on it as early as during the exploration and planning phase.”

Continue talking

Sometimes it is questionable whether functional specification may have gone too far. The most important thing about Systems Engineering is whether the requirements specification has been communicated well. The client and the contractor must continue to discuss this. It is important to explain why you want something, but at the same time, you must then be open to the practicalities. Otherwise, for contractors, it quickly becomes a paper tiger that takes a lot of work and time.

The common goal is to achieve a single, well-functioning system, and that must be done together. Systems Engineering is a useful tool here, but it is important to not get lost in just the theory. It’s all about the principles of working explicitly, which can also mean using a traditional construction specification for standard works. Sometimes that is also a great foundation to achieve what you want.

In practice, I often see that Systems Engineering is exclusively used as a contractual tool. However, I think you should start working on it as early as during the exploration and planning phase. That’s where the major decisions are already being made and it is crucial that the traceability of these decisions is transparent throughout the entire lifecycle. Design decisions cannot be made based on intuition, they must be explicitly made and all relevant information must be immediately and systematically documented.  This directly contributes to better products and is subsequently useful for asset management. Also remember to take a step back from time to time and see if you are on the right track together. I don’t think you can do too much of that.

Do you want to discover more lessons learned?

This article is part of a collection brought together in this book, based on interviews and practical experience from the construction industry.

Developing knowledge products

Currently, I am involved in the Flood Protection Program of the water boards. This sector has a major task, with new standards applying to parts of the primary flood defenses. I see that the new program is giving Systems Engineering a boost within the water boards. The design of these systems must also be made explicit to ensure that they ultimately do the right things. The sector is currently developing knowledge products for the application of Systems Engineering in 21 water boards within the HEEL project. These range from an explanation of the V-model and specifications to verifications for different systems.

A quick start

By interacting with Rijkswaterstaat, the Dutch road and waterway authority, and leveraging experiences from the civil engineering sector, the water boards can build knowledge and support for faster adoption of Systems Engineering. At Rijkswaterstaat, that still took five to seven years, while the water boards can accomplish it in a few years. This development underscores for me that systems thinking is domain independent. It is effective for all complex systems.

Lessons learned

  • Don’t get lost in the theory or how things should be, Systems Engineering is primarily a tool.
  • Use knowledge from other sectors for the adoption of Systems Engineering.
  • Use the method from the planning phase of your project, that’s where the major decisions are made.
Biography

Erik Klijn Velderman

Erik Klijn Velderman studied Civil Engineering at Delft University of Technology and a few years later obtained an MBA in project management for civil projects at TSM Business School. He started his career at Rijkswaterstaat and subsequently worked as an independent Systems Engineering consultant for various clients and contractors. He worked on projects such as A50 Ewijk – Valburg, Nijmegen City Bridge, Bio Science Park Leiden access, and the Tiel – Waardenburg dike reinforcement. Currently, Klijn Velderman is Systems Engineering consultant for the HEEL initiative, part of the Flood Protection Program and Systems Engineering Consultant at Waterschap Zuiderzeeland for Versterking IJsselmeerdijk.

Relatics - Pioneers in Systems Engineering

Pioneers in Systems Engineering
Insights and lessons learned from construction industry professionals.