books

In this article, experts discuss how Systems Engineering is applied in real construction projects, highlighting lessons learned and difficulties encountered over years of experience.

Help, Systems Engineering!

Alexander Heeren first encountered Systems Engineering during the tender phase of the Second Coen Tunnel project. For contractors, Systems Engineering was outside the normal process. The traditional approach of drawing, building and discussing any deviations afterward was exchanged for a method in which you had to demonstrate in advance that you were already meeting the set requirements. At the time, the market was really searching for a practical interpretation. The discussion about the usefulness of Systems Engineering from the early years has subsided, but you can always keep optimizing.

At first, it felt like Systems Engineering was imposed. At the same time, I also thought it was a logical development. In practice, projects are becoming increasingly complex. For example, there are more regulations, and the environment more often plays a larger role. Even without being prescribed, this complexity requires tools to ensure that the output meets demand. With a standard viaduct, the basics are well known, but with more complex systems in particular, it is difficult to keep projects manageable without the right tooling.

“Even without being prescribed, this complexity requires tools to ensure that the output meets demand.”

Keep it simple, stupid

The strength of Systems Engineering is that it provides a structured process, and this process helps you test whether you are meeting the requirements. This does require control of your information management. You want to store and access all relevant information in a structured way. So keep a close eye on its position in the information landscape to avoid duplication of effort. I know from experience that when setting up an information system, you have to guard against too much enthusiasm. If you really start registering and linking everything, you run the risk of proliferation. Therefore, always ask what you really want to store and what functionality you need to do so.

From the user perspective, it is important to keep Systems Engineering tooling in projects simple. For example, I think it’s important for people to be able to do their work with a few clicks. My view is: fewer clicks means more support. A project already requires quite a lot of mandatory input and it helps if this can be done quickly and intuitively. It is also wise to offer functionality in a targeted manner. If someone does not need certain options for their task, turn them off so they do not interfere with the work. These practical things make it easier to convince people that Systems Engineering helps them in their work and that they also help colleagues with their own contributions. This way, tooling can help improve project control and reduce failure costs.

Do you want to discover more lessons learned?

This article is part of a collection brought together in this book, based on interviews and practical experience from the construction industry.

Expectation management

For effective information management, however, it is essential that chain partners work together in a single system. You want to be able to discuss this issue right away. That way, you avoid shopping around or parties taking their own approach anyway. This consultation makes sense, because you should constantly be consulting with each other to fine-tune things anyway. For example, about expectations about what the client wants to see demonstrated and how the contractor can offer that. It is crucial to discuss this carefully in advance to manage mutual expectations. Failure to do so will irrevocably create discussion and therefore failure costs. And if there are any surprises during the process, it is crucial to discuss them immediately. Don’t forget to include specialists in that.

Construction teams

Although Systems Engineering is slowly becoming established, it is still good to see where there are still development opportunities. One such opportunity lies in the new way of working together in the form of construction teams, where the contractor and client operate jointly. Take as an example the replacement and renovation projects now coming to market. In such projects, it is even more difficult to demonstrate the requirements. They are not offered on a silver platter. In many cases, even the client themselves does not know as well as the contractor what needs to be done. To make these projects a success, working in construction teams is very effective. By doing the research stage together, the contractor can help determine the requirements. To me, this kind of development underscores that we must always keep thinking about how to maintain the flexibility to successfully tackle complex projects together in an even more structured and effective way.

Lessons learned

  • Prefer simplicity of support over completeness to ensure support.
  • Provide one coordinated system if multiple parties are working together on the project.
  • Create construction teams or similar forms of collaboration for joint determination of requirements.
Biography

Alexander Heeren

Alexander Heeren has a background in civil engineering. He began his career as a trainee at construction firm BAM where, after completing his studies, he started as a structural engineer, then quickly moved up to project manager. He then advanced to become director of infrastructure at construction firm Besix. In addition to a role as a teacher expert with NEVI, Heeren was also active with Bouwend Nederland. He is currently director of integrated projects at construction firm Van Hattum en Blankevoort.

Relatics - Pioneers in Systems Engineering

Pioneers in Systems Engineering
Insights and lessons learned from construction industry professionals.