In this article, experts discuss how Systems Engineering is applied in real construction projects, highlighting lessons learned and difficulties encountered over years of experience.

High-quality outsourcing

When Bert van Wersch entered the civil engineering sector from the IT industry in 2008, he found it remarkable that Systems Engineering was not being used in complex and less complex projects. After all, that is what he was used to in the IT sector. How can you design, build and commission a successful system without this structured thinking and approach? Meanwhile, the added value of systems thinking, thinking in terms of functions and recording everything explicitly and traceably is widely accepted.

Systems Engineering was introduced at a time when clients were leaving more to the market and still wanted to maintain control. In that environment, the basis of tender principles is different. In order to procure correctly, Systems Engineering was then chosen as the methodology for projects. Clients took this development quite seriously. For example, at ProRail, the Dutch railway authority, I was on an inspired team implementing Systems Engineering. There was a great drive to start doing things differently. As a result, the clients may also have gotten a bit ahead of themselves, because contractors also had to get used to it and, in the beginning, did mostly what was necessary.

When the market has to do more, the challenge for clients is to stay in control and maintain a complete overview. As a result, you must continue to cooperate intensively. This requires a clear process, easy information exchange and good IT tooling. At the outset, central IT departments paid too little attention to the IT needs of infra projects to maintain direction and tender responsibly.

“At the outset, central IT departments paid too little attention to the IT needs of infra projects to maintain direction and tender responsibly.”

Preserving the good

Sometimes I noticed that the existing rules and guidelines for design in the civil engineering sector were ignored. In the beginning, the design freedom had to be as broad as possible. When functional specification was done with little experience, it resulted in solutions that may have met the requirements but did not properly address the need. All this while, of course, excellent systems had been built in the past. This created an unnecessary tension between the accumulated knowledge of good solutions and the project saying: it has to be completely different and the market is going to do it. Design guidelines are there for a reason. They contain a lot of knowledge and experience. In my opinion, there is nothing wrong with keeping the good and giving attention to the things that could be improved.

Systems Engineering as a separate role

I also noticed that Systems Engineering was seen everywhere as something extra within the project. A Systems Engineering consultant was added and everyone continued to do their thing. It was a separate role that would put everything into an IT tool to meet Systems Engineering requirements. Limited effort was made to really work according to Systems Engineering principles. The Systems Engineering consultant was filling in the gaps because other disciplines lacked knowledge, while the intent was for these disciplines to design a working system together. Design and Systems Engineering did not act jointly in the exploration and/or planning study phase. In design notes, design choices were substantiated, but without verifying and validating them with the requirements at the various stages.

Do you want to discover more lessons learned?

This article is part of a collection brought together in this book, based on interviews and practical experience from the construction industry.

Functional performance

In view of the process itself, I found it unfortunate that the underlying need was often still left out of the picture. In practice, it turned out that many solutions were described from a management and maintenance perspective. But there was not enough attention to what demand that system solved. There was limited attention to the functional performance required and delivered in the various circumstances and why what design choices had been made. This creates discussions later in the process.

I think the importance of Systems Engineering has only increased in recent years. The things to consider when designing civil engineering systems continue to grow. This means that the importance of systems thinking is also growing, and both client and contractor need to consider even more carefully how, where and why functions should be delivered. This requires the ability to zoom out to a larger “mobility architecture” to which solutions must conform. This means you have to make choices as a society and, above all, implement and enforce them.

Lessons learned

  • For long-term civil engineering projects with high information density, always record information in a structured and reusable way.
  • Do not overlook already acquired knowledge and experience about good solutions in functional specification.
  • Pay attention to functional performance in different conditions and explicitly document design choices.
Biography

Bert van Wersch

Bert van Wersch started his career as an IT consultant at Capgemini, after which he advanced to the role of IT director at ING Car Lease Benelux (now: Alphabet Lease). For change specialist GANTO, he went to work in the civil engineering sector, where he advised and coached clients such as ProRail, Rijkswaterstaat, TenneT, TBI, provinces and water boards on IT support, information management and Systems Engineering. Currently, Van Wersch is product owner of SchadeVolgSysteem and the Balie at Rijkswaterstaat.

Relatics - Pioneers in Systems Engineering

Pioneers in Systems Engineering
Insights and lessons learned from construction industry professionals.