books

In this article, experts discuss how Systems Engineering is applied in real construction projects, highlighting lessons learned and difficulties encountered over years of experience.

Look beyond the tip of your nose

Hans Bruinsma was introduced to Systems Engineering early. Rijkswaterstaat, the Dutch road and waterway authority, wanted to outsource more to the market, but to maintain control, design and execution had to be structured and testable. Systems Engineering is the tool of choice for this purpose. As the person responsible for tunnel maintenance within Rijkswaterstaat, he sees that the methodology currently focuses primarily on the process and contract phases. To make optimal use of the added value, Systems Engineering needs to cover the entire life cycle of a system.

At first, I was very curious about this new way of working and was able to experiment with functional specification in a study on the introduction of a toll system in the Netherlands. Existing systems did not yet exist in the Netherlands, so we were able to ask the various stakeholders what they needed. After that time, I made Systems Engineering more and more my own, and I saw the same with other market participants. For example, I co-wrote the first versions of the Dutch Systems Engineering Leidraad (‘guideline’). With this, the market tried to jointly define a new approach.

“The trick now is to rise above the contract and project context and consider the complete life cycle of a system.”

Clear requirements

The goal of Systems Engineering in the civil engineering sector was primarily to put contracts into the market in a manageable way. Here, the Systems Engineering approach helps determine whether functional requirements have been met during both design, realization and project delivery. The prerequisite is that there are actually clearly described requirements that are really verifiable. That does not apply to terms such as beautiful or ugly. In the first wave of contracts, I still saw many discussions about how exactly you verify a requirement. Especially in the beginning, there were too many requirements with no consistency between them, so the most critical requirements got snowed under. The client wanted to maintain control and see all sorts of things demonstrated, and contractors still struggled with that. In my opinion, the question of what really matters is still not being asked enough. This needed and still needs to grow.

Untouched territory

While I think Systems Engineering has done its job well and is delivering great projects in recent years, for me the application is still too limited. The focus is too much on the contract and the process. The stakeholders tell us what they want, and that is translated into customer and system requirements in the design. The construction phase is followed by delivery and then the contract is completed. By quitting then, however, you do not experience the pain or real value that the system brings to users.

To me, Systems Engineering is more than just developing a system. A system must eventually be maintained. You have to think about that in the design phase. An object often stands for 70 to 100 years. It is important to estimate in advance what will happen to the system during its life cycle. This is still untouched territory. Conveniently, it is now assumed that the asset manager will make sure it continues to work. What it takes for proper maintenance is not yet receiving sufficient attention. In fact, you may base the maintenance plan on the structure of a contract which is not suitable for this. In fact, the asset management situation is substantially different.

Do you want to discover more lessons learned?

This article is part of a collection brought together in this book, based on interviews and practical experience from the construction industry.

Future function

I understand that it is difficult to determine how functions should perform in the (distant) future. But if you don’t, the cheapest construction option is often chosen. Moreover, the life cycle is not considered, or not considered enough, in the design phase choices. Therefore, it is essential to understand in advance exactly what the use of the object is for. Otherwise, you run the risk of making the wrong design choice. For example, if parts are used more than estimated, maintenance is needed more quickly. This can then cause problems in the asset management phase. Such a situation is relatively easy to avoid if you really apply Systems Engineering and approach complex projects integrally.

A great deal has already been achieved with Systems Engineering in recent years. The trick now is to rise above the contract and project context and consider the complete life cycle of a system.

Lessons learned

  • Make sure there are clear requirements that are truly verifiable.
  • Always consider the entire lifecycle when designing and realizing the object.
  • In every design decision, consider what function is to be fulfilled.
Biography

Hans Bruinsma

Early in his career, Hans Bruinsma researched the introduction of a toll system and dynamic traffic systems. After a switch, he was involved in the introduction of Systems Engineering within engineering firm Grontmij (now Sweco). During that period, he co-wrote the first Dutch Systems Engineering Leidraad (‘guideline’) on behalf of NLingenieurs. He is currently co-responsible for maintaining tunnels for the Rijkswaterstaat department Programs, Projects and Maintenance (PPO).

Discover more lessons learned

Lesson learned
Your wish is our command?

With a background in electrical engineering and automation, Eles Leiwakabessy has been providing ICT support for many years at electrical contractor…

Requirements for the building requirements
Lesson learned
Requirements for the building requirements
Juriaan van Meel’s first experiences with Systems Engineering were more or less accidental. As an architectural engineer, he was asked years…
Lesson learned
One shared world

The introduction of Systems Engineering at Rijkswaterstaat, the Dutch road and waterway authority, presented challenges for both clients and contractors, Ton…

Relatics - Pioneers in Systems Engineering

Pioneers in Systems Engineering
Insights and lessons learned from construction industry professionals.