When Frank Keizer came across Systems Engineering as tender manager at the Second Coen Tunnel, he literally wondered if the people at the client had gone mad. The Requirements Specification was a thick stack of papers that lacked coherence. Only when all the information was logically structured and the interdependencies visible did Systems Engineering become concrete for him. Nowadays, he feels that a complex project cannot do without it.