In this article, experts discuss how Systems Engineering is applied in real construction projects, highlighting lessons learned and difficulties encountered over years of experience.

Reap the benefits during use

Paul Warmerdam is convinced that the greatest benefit of Systems Engineering is in the use phase. After all, that is where users experience the added value of the system. To ensure optimal availability after commissioning, maintenance must be secured as early as the design phase. That is where he believes the most gain can be achieved. But you do have to make sure that all information is immediately stored in a structured and traceable way. 

With Systems Engineering, you can incorporate the user’s needs into the design right away. If you make smart choices in that phase to make the system robust, you won’t need to replace much in the use phase and you can design maintenance smartly. This contributes directly to availability. At the beginning of the project you still have the most influence; after that, it declines rapidly.

“With the information available, we were able to not only repair the damage, but also eliminate the cause.”

User central

The user should be at the center of the project, not the contract. If requirements aren’t met outside, but the road user is not experiencing any problems, it is madness to put the cutter in the asphalt. That clashes with the circular world we need to move toward. On the other hand, we should not bury our heads in the sand if the contract is met but the road is not safe.

In a DBFM project (Design, Build, Finance, Maintain) such as SAAone A9 – A1 – A6, you are judged on availability for a period of 25 years. Therefore, you must demonstrate this every year. In a standard project, you only have to demonstrate the requirements once and then you can deliver. Therefore, it is important to periodically verify that the contract accurately reflects the experiences of (road) users.

Operational knowledge

For proper asset management, quick wins in the design and construction process are of no use. This is why it is important that the asset manager is already involved during the design phase. Then you can also go beyond just demonstrating minimum requirements and thus actually optimize the design. Operational knowledge is indispensable here.

For example, the design of ViA15 near Arnhem involved a mowing specialist. By thinking carefully in advance about the accessibility of the mowing plots and locally choosing a slightly wider hard shoulder, it will later be possible to mow during the day. In addition, fewer road closures are required for this purpose. All this helps to improve availability and safety. So this one investment in the design phase yields money every year in the operation phase.

Do you want to discover more lessons learned?

This article is part of a collection brought together in this book, based on interviews and practical experience from the construction industry.

Working systematically

When information is recorded in a structured manner at all project phases, it is easily retrievable even after commissioning. So good information management is crucial for the maintenance phase. This allows you to act very systematically when unforeseen issues or problems arise. What’s going on? Why and is it bad? You get the answers to those questions easily from the systems for design files, risks, inspections and deviations. Little discussion is needed, and you avoid having to do deep detective work in various documents and systems and additional research on an issue like a Sherlock Holmes. All information on interfaces, risks, deviations and design is at your fingertips. Furthermore, it is important to be stringent on quality control and review. Because if something is well built, you need less maintenance.

I have experienced crack formation in the transition from a structure to the road. In Relatics, I quickly saw that there was a deviation. The cause was clear so we did not have to do additional research outside, which by definition affects availability and user experience. With the information available, we were able to not only repair the damage, but also eliminate the cause. To me, this underscores the importance of Systems Engineering and information management.

Lessons learned

  • Take maintainability and robustness of the system into account in the design.
  • Get asset managers involved during the design phase.
  • Organize information management during the project so that it can also act as a reference tool in the use phase.
Biography

Paul Warmerdam

Paul Warmerdam graduated in Civil Engineering at Delft University of Technology in 2003. After his graduation project on the Dutch High Speed Line (HSL), he stayed there and also began working on Boortunnel Groene Hart for contractor Bouygues. He then moved on to construction firm Ballast Nedam, first in work preparation and design, then setting up Systems Engineering. He later became a RAMS Engineer for the Willem Alexander Tunnel in the A2 near Maastricht and the Tunnel A9 Gaasperdammerweg. Warmerdam joined construction firm Hochtief in 2017 where he worked on RAMS, EMVI and risk management. He is currently asset manager on the DBFM project SAAone A9 – A1 – A6.

Discover more lessons learned

It' still human work
Lesson learned
It’s still human work

Carlo Kuiper has a technical background, but is an atypical techie. During his career, communication within projects increasingly took a leading…

Buitenring-Parkstad-Limburg-001
Lesson learned
Throwing it over the fence

According to Harro Verhoeven, information management is key within Systems Engineering. In his view, however, when recording data in the process,…

Lesson learned
Everyone gets their share

Cees Michielsen is primarily active in the high-tech and IT sectors. Systems Engineering is fully established in these sectors. It is…

Relatics - Pioneers in Systems Engineering

Pioneers in Systems Engineering
Insights and lessons learned from construction industry professionals.