books

In this article, experts discuss how Systems Engineering is applied in real construction projects, highlighting lessons learned and difficulties encountered over years of experience.

Systems Engineering is not a silver bullet

When Rijkswaterstaat, the Dutch road and waterway authority, embraced the principle of “The market, unless…,” engineering firms and contractors had to act on it. Paul Govaerts took on the challenge. He led the Systems Engineering department of engineering firm DHV (now Haskoning) and provided training on Systems Engineering, among other things. He himself linked theory to practice with the functional specification of the A4 near Dinteloord project. He soon realized that it is not the holy grail. It is primarily a tool for managing complex projects and gives “The market, unless…” hands and feet. 

Different sectors use Systems Engineering. Still, I think there is a clear difference between the civil engineering sector and, say, the auto industry or aviation sector. There, the products are usually tangible and the parts are more clearly defined. It is different with a complex infrastructure project. This is where Systems Engineering’s approach clashes with the complexity and scale of these projects. Therefore, Systems Engineering may have felt a bit forced for me at first. Rijkswaterstaat was still all about the substance and knew what was needed. This created a tension between design freedom and requirements.

“The world is always changing. This means that requirements and client demand also change automatically.”

Giving space

If I am honest, I find the freedom to be gained with Systems Engineering disappointing. In the civil engineering sector, many parts are already fixed, whereas the challenge was and is to really give each other space. Example: both imposing the width of the road and formulating many requirements for safety and function is oppressive. On the other hand, if freedom is then offered, it is precisely in high-risk areas. For example, freedom in material choice can be a major risk. Risks remains a bottleneck regardless. You can only manage these if you discuss them early, accept them together and try to get ahead of them. You can write it all down explicitly with Systems Engineering, but you don’t avoid problems with it.

In my view, there are other areas of concern. For example, if there is agreement on the client’s demand and its interpretation, that does not guarantee success. Thus, to me there is an obvious difference between building something right or building the right thing. In the first case, you have demonstrably met the requirements. But whether you also built the right thing is harder to determine. Especially when circumstances change. After all, years pass before a project goes from planning study to delivery. With the Dutch High Speed Line (HSL) Zuid, it was more than 20 years. The world is always changing. This means that requirements and client demand also change automatically. You can never fully determine those in advance.

Do you want to discover more lessons learned?

This article is part of a collection brought together in this book, based on interviews and practical experience from the construction industry.

Involving parties

In my experience, it is also an illusion to be able to formulate clear requirements unilaterally at the beginning. Consider the maintenance aspects of the object to be realized. Covering these properly can only be achieved by involving all parties in this and helping them think of an acceptable solution. That’s why I favor involving the contractor in the process from the beginning. So I think the rise of construction teams is a good thing. That way, you go through the process together and understand each other’s interests much better. This increases the chances of a realistic price and a good solution.

Finally, I have found that getting a project right the first time is an illusion. It is crucial to realize that a project will not run logically from A to Z. For this, there is too much complexity and the project takes too long. You should always be alert to that.

No matter how well you apply Systems Engineering, every complex project runs around at least once. At that point you shouldn’t start pointing fingers; rather, it’s a matter of smoothing it out together. The best option then is to shut down and work as a team. Systems Engineering is also a tool at this stage. You will find answers to such questions as: What did we want? What do we have now? How do we get back on track? That way you can move forward together again.

Lessons learned

  • Think carefully about how you want to interpret freedom within the project.
  • Pay joint early attention to use and maintenance.
  • Don’t automatically assume that the project will run as you initially envisioned.
Biography

Paul Govaerts

Paul Govaerts studied Civil Engineering at Delft University of Technology and started at construction firm Heijmans, but soon made the move to engineering firm DHV (now Haskoning). Here, he was a consultant on projects such as the A4 Dinteloord and the Dutch High Speed Line (HSL) Zuid, among others. He then held various management positions at NACO, a subsidiary of Haskoning that designs international airports. Currently, Govaerts is a director at consulting and engineering firm LBP|SIGHT.

Relatics - Pioneers in Systems Engineering

Pioneers in Systems Engineering
Insights and lessons learned from construction industry professionals.