In this article, experts discuss how Systems Engineering is applied in real construction projects, highlighting lessons learned and difficulties encountered over years of experience.

Technical opportunities

Rutger van den Noort describes his first experiences with Systems Engineering as pioneering. Projects were no longer put on the market with traditional construction specifications, but the combination of functional specification and requirements verification set the tone. Both he, his organization and the market had to get used to this new way of working. In this exploration, technological tools provided guidance and structure. At the same time, ongoing developments constantly ushered in new pioneering phases.

My first Systems Engineering project was a tender for ProRail, the Dutch railway authority. This was a contract, based on the UAV-GC integrated contract standard, with a functional requirements specification and an obligation to demonstrate compliance. Back then it was really about figuring out how to properly analyze requirements and demonstrate how to meet them. At first it was still done in Excel, but soon we were creating a model in an Access database. That was a fun period where we had to solve things together. And it worked; we had the winning bid and we could demonstrate everything sufficiently with our database.

Today, the world is much more dynamic. I noticed this during the A50 Ewijk – Valburg project. There, from day one, there was discussion with the project manager about how we could demonstrate compliance with 8,000 requirements. We managed to set up a full-fledged Systems Engineering model to support the design process and make everything demonstrable. However, much coordination was still needed at that time regarding system design, responsibilities and the systematic delivery of completion and commissioning reports within the agreed schedule.

“Choosing a standard approach always helps teams work explicitly and demonstrably.”

Embedding in projects

All these practical experiences were the prelude to the standardization of Systems Engineering within the Mobilis organization. The result was “Mobilizer,” a template in Relatics for integrated project management. This fully aligns and integrates process and information management. Project teams use this standard template to embed the Systems Engineering approach within projects. This includes links to a document management system, work packages, planning and BIM. Through this approach, Systems Engineering thinking has been incorporated into standard operating procedures, ensuring that teams are always in control of information management and the progress of their projects.

Mobilizer offers projects a good setup. The relationship between objects and requirements is clear, and you can create cross-sections and reports in a variety of ways. Thus, the Systems Engineering methodology can be applied in all levels of work. Another benefit are risk management and permit libraries. From these libraries, the system is easy to enrich and projects can start up faster.

Choosing a standard approach always helps teams work explicitly and demonstrably. In addition, the advantage is that this basis is usable for multiple forms of contracts, from traditional construction specifications, construction team to NEC4. Specifically, it is also possible to work with a work breakdown structure without a requirements specification. This helps maintain and leverage the power of Systems Engineering despite different contract forms.

 

Do you want to discover more lessons learned?

This article is part of a collection brought together in this book, based on interviews and practical experience from the construction industry.

Data-driven work

Because we record a lot of information, the goal is to be more data-driven. Project information is enormously valuable to gain insight across projects. Therefore, we export data from Relatics, for example, and transfer it to Azure to create reports and cross-sections with analysis tools. Those insights are then used for our lessons learned. With the broad analysis capabilities, we are able to use the available data to further improve project management. For example, a system has been developed that helps estimate the effectiveness of mitigation measures.

Lessons learned

  • Ensure that Systems Engineering thinking is incorporated into standard operating procedures.
  • Use libraries to get projects up and running faster.
  • View project information as a valuable source of analysis for the benefit of future projects.
Biography

Rutger van den Noort

Rutger van den Noort studied Civil Engineering and then joined the construction firm TBI Beton- en Waterbouw Haverkort as a work planner and calculator. Next, he became risk and quality manager at Waalkoppel, the combination responsible for the realization of the A50 Ewijk – Valburg project. After intermediate steps as construction coordinator and manager information systems, Van den Noort is now information manager/team leader of the information management department at construction firm Mobilis TBI. He also taught various courses and training on work preparation and Systems Engineering.

Relatics - Pioneers in Systems Engineering

Pioneers in Systems Engineering
Insights and lessons learned from construction industry professionals.