In this article, experts discuss how Systems Engineering is applied in real construction projects, highlighting lessons learned and difficulties encountered over years of experience.

The journey of requirements

When Rijkswaterstaat, the Dutch road and waterway authority, opted for “The market unless…” based on functional specification, it meant a challenge for both clients and contractors; the roles in construction changed. One had to formulate the correct requirements and the other had to verify the requirement in the design and prove through inspections that the solution actually met it. According to Art Koelewijn, there is still a gap between the formulation of the client’s functional requirement and its demonstrability by the contractor. Quality management plays a key role here.

At first, when the Rijkswaterstaat Construction Department was still working according to the EKB methodology, it turned out that demonstrating requirements is not an accountant’s job. You also had to comply with other, non-project-specific, requirements at the time. That was quite a challenge. I first encountered Systems Engineering at the Dutch High Speed Line (HSL) in 2004, and back then, we were still creating verification plans and reports in dBase. Here, I learned a lot about requirements analysis and its relation to inspection, testing and the commissioning reports. But it was still a bit makeshift at the time. That changed with the A4 Burgerveen – Leiden. We set up a digital model that allowed everything to be captured in its context. With smart information management, inspections became more easily traceable to the corresponding requirement.

Managing risks and processes

Demonstrating compliance with requirements through verifications became the responsibility of the contractors. Fortunately, the Dutch Systems Engineering Leidraad (‘guideline’) offered a low-key approach. Systems Engineering is the journey of the requirement, from input to output and vice versa. In it, during the execution phase, the contractor must write down what they will do and do what they have written down. This is necessary to demonstrate requirements and to manage interfaces, risks, but also deviations.

“Ultimately, the application must fit the process, not the other way around.”

Registration points

You must demonstrate the requirements and record this meticulously. In work preparation, you verify the set requirements in a work or inspection plan. By incorporating the requirements as a registration point in the inspection plan, you can be sure after the inspection that everything is in line with the contract. All requirements are then demonstrated not only in the design process, but also in realization. The requirement is the input into the V-model, where the left side is the promise and the right side is the fact.

As a quality manager, I have an independent and coaching role. I encourage teams to be focused on delivery right from the start of work preparation. Once you have properly mapped out the requirements and arranged the inspection, the execution can focus on the realization. At that point, in a practical sense, the contractor no longer has anything to do with Systems Engineering during their work. In addition, the commissioning report then meets the specified requirements.

Do you want to discover more lessons learned?

This article is part of a collection brought together in this book, based on interviews and practical experience from the construction industry.

Reporting in order

Furthermore, it is crucial to be focused on delivery from the very start of execution. You want to optimize turnaround time, but the turnaround time for getting commissioning reports accepted is often too long. Therefore, it is important from day one to pay close attention to what can be delivered during execution and what can be delivered upon delivery. This is achievable only if reporting is fully in order.

In practice, I see that all major contractors now have systems engineers and control this process themselves. By the way, it is important to realize that supporting tooling should never be leading. Ultimately, the application must fit the process, not the other way around. In addition, setting up the tooling really requires real-world knowledge. The key is to always keep the goal in mind, and that is for the tooling to support the project. Otherwise, you quickly fall into a kind of stranglehold and that is not workable. And more importantly, it does not produce the desired results.

Lessons learned

  • In the design phase, make the “object” leading, and in the execution phase, make the “activity” leading to realize the object.
  • From the start of work preparation, make sure that you are already focused on the delivery and organize the inspection so well that the execution does not have to be involved in Systems Engineering at all.
  • Always design IT systems to match the project needs with sufficient real-world knowledge.
Biography

Art Koelewijn

Art Koelewijn studied Civil Engineering and Business Administration. After his studies, he went to work almost immediately as a quality manager, both on the client and contractor side. Since 2001, Art has been an independent consultant on process control within infrastructure projects from his own company K2 Infra – Consultants. His involvement included major projects such as the Western Scheldt Tunnel, A4 Burgerveen – Leiden, Sluiskil Tunnel, KARGO and the Amstelveenlijn. He currently acts as quality manager on the Oosterweel Link project in Antwerp.

Discover more lessons learned

Lesson learned
A good start is half the battle

As a designer early in his career, Rembrandt Koops saw the opportunities that digitizing structured and coherent data presented for his…

Europees Geneesmiddelen Agentschap
Lesson learned
A digital construction world

The tender for the Second Coen Tunnel involved a new approach that also considered lifecycle processes. Although Ton Buijink was already…

Lesson learned
Gaining momentum

By the late nineties, it seems that the zeitgeist was ready for Systems Engineering. The structured project approach, where you set…

Relatics - Pioneers in Systems Engineering

Pioneers in Systems Engineering
Insights and lessons learned from construction industry professionals.