In this article, experts discuss how Systems Engineering is applied in real construction projects, highlighting lessons learned and difficulties encountered over years of experience.

Your wish is our command?

With a background in electrical engineering and automation, Eles Leiwakabessy has been providing ICT support for many years at electrical contractor Croonwolter&dros. The ICT for complex projects based on Systems Engineering is a hefty challenge, since this involves large amounts of information. By structuring everything into a system and establishing interrelationships, you create overview. This benefits users by making it easier for them to understand Systems Engineering and bring their project to fruition.

My own development paralleled the development of the market. In the beginning, it was difficult to fathom Systems Engineering and provide the right tooling. Especially when users also had to get used to it. They were convinced they already knew how to tackle a construction project, and until then, they just had all the information in their heads, somewhere in a folder or on their PC. The Second Coen Tunnel was my first project that was 100% Systems Engineering based. We have tried to be as comprehensive as possible here, in all conceivable contexts and Systems Engineering concepts. The system we set up for that purpose was very extensive, which often made it too complex for users. They are particularly interested in where they can store and find their information and what the interdependencies with other disciplines are. And that should be simple and approachable, but the gap was too wide with what we were offering.

“This makes delivery of information easy, and the client can monitor the process, increasing trust.”

Generating support

In practice, people are reluctant to let go of their existing patterns. Convincing colleagues that Systems Engineering really works was quite the task. To best support them, I asked two crucial questions: what is relevant to working in accordance with Systems Engineering and what does the user want? The answers are the starting point for the right tooling. On the one hand, this is how you try to anchor that work is really being done in accordance with Systems Engineering; on the other hand, it provides space to get people on board and generate support. However, you have to be wary of trying too hard as a supporting project management department. If you honor all requests, you might drift too far from the method. That is a balance you have to guard well, and where I may have listened too much to users in the beginning. Fortunately, you can always adjust.

Do you want to discover more lessons learned?

This article is part of a collection brought together in this book, based on interviews and practical experience from the construction industry.

Growth process

We have gone through a growth process as an organization. Previously, each project had its own environment, which was often not set up until the project was already underway. Moreover, the project manager was not always paying much attention to Systems Engineering and tooling. The project result was under time pressure and had top priority while the Systems Engineering support mainly cost extra money and effort in the eyes of the project manager. Not weighing methods and tooling on the front end and relying only on experience is cutting corners. I see that as a missed opportunity, because fixing things after the fact is always more expensive. On top of that, exchanging information was not that easy and learning from each other’s experiences was limited.

More trust

What stays with me is the enormous added value we realized by providing client access to our Systems Engineering tool. This has resulted in a positive contribution to the cooperation between contractor and client. In a project, there is a lot of mutual communication. If the client provides an implied requirement, we have to dissect that well and that always raises questions. Before, that meant a lot of document and mail traffic. Now we address that centrally and in a structured way. This makes delivery of information easy, and the client can monitor the process, increasing trust. Finally, it allows projects to get underway faster.

In the last two years, I have noticed that a standardization process has begun. A project management department has been created, which makes sure that all projects are working in the same way. This movement is reinforced by the fact that the new generation is well acquainted with Systems Engineering. There will always be a tension between standardization and freedom, but the most important thing is to always show what colleagues can achieve relatively easily with Systems Engineering within complex projects.

Lessons learned

  • Find a balance in supporting the method and the practical needs of the end user.
  • Set up the system right from the start, don’t wait until the project has already begun.
  • Give clients access to their own Systems Engineering information.
Biography

Eles Leiwakabessy

After studying Electrical Engineering, Eles Leiwakabessy worked as a research engineer at Techno Fysica where he developed measurement systems for marine and offshore applications. After a stint as IT manager and ICT project coordinator at Croon Elektrotechniek, later Croonwolter&dros, he joined the Engineering Development Department in 2005, which is now the Project Management Department. As a Relatics specialist, he was involved in projects such as De Groene Boog (A16-A13), the Haringvliet Bridge, the Pallas reactor and the IJsselmeer bridges and locks. He also manages the systems for projects for which Croonwolter&dros has multi-year maintenance contracts such as the Second Coen Tunnel, A15 Maasvlakte – Vaanplein and the Western Scheldt Tunnel.