Project in the spotlight

Fehmarnbelt Fixed Link

The Fehmarnbelt Fixed Link is an under-construction immersed tunnel, connecting Lolland in Denmark with Fehmarn in Germany, across the 18-kilometer wide Fehmarn Belt in the Baltic Sea. Once completed it will be the world’s longest immersed road and rail tunnel.

Flag Denmark - Relatics
Tunnels
Infrastructure

The Fehmarnbelt Fixed Link is one of Europe’s most significant infrastructure projects, creating a direct road and rail connection between Denmark and Germany. The tunnel replaces the existing ferry crossing, creating a faster and more efficient corridor for passengers and freight, strengthening the economic corridor between Scandinavia and Central Europe.

Project context

Owned and managed by Sund & Bælt, the tunnel is assembled from large precast concrete elements that are manufactured, transported, and immersed with exceptional precision in a challenging marine environment. The scale of the works requires close coordination between multiple international contractors, authorities, and technical disciplines. Once completed, the tunnel will become a key component of the Trans-European Transport Network.

Fehmarnbelt Fixed Link - Relatics project
Projecten insights - money value

7.4 billion EUR

Relatics iconen set_Projecten insight - facts 2

18 km immersed tunnel

Relatics Insights

89 tunnel elements

Completion time

2020 - 2031

Managing complexity at scale

For Sund & Bælt, delivering the Fehmarnbelt Fixed Link involves much more than managing the construction of the tunnel itself. The organization coordinates a large portfolio of contracts covering everything from civil works and railway systems to power supply and tunnel installations. Each contract introduces its own requirements, procurement processes, evaluation activities, and stakeholder interactions.

Relatics supports Sund & Bælt throughout procurement and delivery by providing a structured environment for managing requirements, evaluations, and technical information. By maintaining traceable relationships between requirements, contractual obligations, supplier submissions, and project information, project teams can work more effectively and maintain consistency across contracts. The ability to reuse and manage information across multiple contract packages helps reduce duplication of work, improves oversight, and supports a more controlled delivery process as the project continues to evolve.

In addition to Sund & Bælt, Relatics is used by both European contractor consortia: Fehmarn Belt Contractors (FBC), comprising Boskalis and Van Oord, and Femern Link Contractors (FLC), comprising VINCI, Per Aarsleff, Wayss & Freytag, Max Bögl, CFE, Soletanche Bachy, BAM Infra, BAM International and Dredging International.

Discover more projects

Dike
Tiel-Waardenburg dike reinforcement
Flag The Netherlands - Relatics

Tiel-Waardenburg dike reinforcement

Part of the Flood Protection Program, the Tiel-Waardenburg dike reinforcement strengthens flood defenses along the river Waal. The project upgrades the dike to meet modern safety standards and better protect surrounding communities from flooding.

Dura Vermeer

Onshore energy
HumeLink West CPB Contractors - Relatics project
Flag Australia - Relatics

HumeLink West

HumeLink is one of New South Wales’ largest electricity transmission projects, delivering 365 km of new high-voltage lines connecting Wagga Wagga, Bannaby and Maragle. The project will strengthen grid reliability and increase renewable energy capacity across the region.

CPB Contractors, UGL

Ports
Flag The Netherlands - Relatics

Port extension Maasvlakte 2

Maasvlakte 2 expanded the Port of Rotterdam into the North Sea, creating 2,000 hectares for port-related industry and logistics. The project comprised land reclamation, sea defences, port basins, quay walls, and transport infrastructure.

Port of Rotterdam, PUMA (Boskalis, Van Oord)