The Marinus Link is a high-voltage electricity interconnector under construction between Tasmania and mainland Australia. It aims to enhance energy security, integrate renewables, and support the transition to a reliable, low-carbon power system.
Marinus Link is a nationally significant energy project that will strengthen the resilience and flexibility of Australia’s electricity network. By creating greater access to Tasmania’s renewable energy resources, the project supports the transition toward a more sustainable and reliable energy future.
For more information about this project, also read this customer story.
The project involves the delivery of a 345-kilometre high-voltage direct current (HVDC) interconnector between Tasmania and mainland Australia. With a transmission capacity of 750 MW, the link will connect electricity markets across state borders and enable the exchange of energy between regions. The project combines marine, energy, environmental, regulatory and stakeholder challenges, while bringing together multiple contractors, technical systems, and stakeholders that must remain aligned throughout delivery.

5 billion AUD

345 km HVDC-cable

750 MW capacity

2026 - 2030
On Marinus Link, success depends not only on engineering excellence but on connecting information across disciplines. Relatics acts as the project’s single source of truth, bringing together requirements, interfaces, stakeholder management, land access, safety and assurance in one connected environment. By linking information and making dependencies traceable, teams gain clear ownership, improve coordination, and continuously align decisions throughout delivery. Instead of making separate information streams, teams work within a shared environment where responsibilities, progress, and dependencies remain visible across disciplines. This reduces fragmentation, rework, and project risk while improving transparency throughout delivery.
Discover more projects

Part of the Flood Protection Program, the Tiel-Waardenburg dike reinforcement strengthens flood defenses along the river Waal. The project upgrades the dike to meet modern safety standards and better protect surrounding communities from flooding.
Dura Vermeer

The project involved constructing a new lock in a major international waterway. Since the existing locks caused a bottleneck for shipping between Western Scheldt and the Ghent-Terneuzen Canal, the new lock improves accessibility of the Ghent and Terneuzen ports.
Vlaams-Nederlandse Scheldecommissie, Sassevaart (BAM, DEME, Van Laere)

HumeLink is one of New South Wales’ largest electricity transmission projects, delivering 365 km of new high-voltage lines connecting Wagga Wagga, Bannaby and Maragle. The project will strengthen grid reliability and increase renewable energy capacity across the region.
CPB Contractors, UGL