Part of the Flood Protection Program, the Tiel-Waardenburg dike reinforcement strengthens flood defenses along the river Waal. The project upgrades the dike to meet modern safety standards and better protect surrounding communities from flooding.

Flag The Netherlands - Relatics
Dike
Water

The Tiel-Waardenburg dike reinforcement project focuses on delivering long-term flood safety while applying sustainable construction methods. The program includes raising the flood barrier, installing more than 9 kilometers of sheet piling dam walls, and extensive construction activities carried out in a densely populated river landscape adjacent to a Natura 2000 protected area.

Project context

Construction consortium Mekante Diek, a collaboration between Ploegam, Van Oord and Dura Vermeer, delivers the project, which involves strengthening more than 19 kilometers of flood defense infrastructure between Tiel and Waardenburg. The project is one of the first large-scale infrastructure projects in the Netherlands to be executed almost entirely using electric heavy machinery, powered by renewable energy. Additional sustainability initiatives include the use of locally sourced materials, transportation by water, and the application of recycled asphalt.

Tiel-Waardenburg dike reinforcement
Projecten insights - money value

264 million EUR

Relatics iconen set_Projecten insight - facts 2

19.4 km dike reinforcement

Relatics Insights

1,900 tonnes of CO2 saved

Completion time

2023 - 2027

Managing interdependencies across construction

One of the defining challenges of the Tiel-Waardenburg dike reinforcement project is delivering large-scale construction works while significantly reducing emissions. Maintaining a continuous flow of materials and equipment is essential, as the extensive use of electric machinery creates additional dependencies between logistics, energy availability, planning, and on-site execution.

For the Mekante Diek consortium, coordinating these interrelated activities requires close collaboration between contractors, suppliers, and project stakeholders. The scale of the project, combined with the installation of more than nine kilometers of sheet piling and works spread across a 19-kilometer dike section, means that construction sequences, material deliveries, and resource availability must remain carefully aligned throughout delivery.

As the project progressed, the rate at which sections of the dike reached the required settlement proved faster than anticipated, allowing parts of the construction schedule to be accelerated. Managing changes of this nature requires project teams to maintain a clear overview of planning assumptions, project decisions, and their impact on ongoing activities. Access to reliable project information supports decision-making and collaboration, helping the consortium maintain progress while working towards its ambitious sustainability objectives.

Discover more projects

Onshore energy
HumeLink West CPB Contractors - Relatics project
Flag Australia - Relatics

HumeLink West

HumeLink is one of New South Wales’ largest electricity transmission projects, delivering 365 km of new high-voltage lines connecting Wagga Wagga, Bannaby and Maragle. The project will strengthen grid reliability and increase renewable energy capacity across the region.

CPB Contractors, UGL

Tunnels
Relatics - Western Scheldt Tunnel
Flag The Netherlands - Relatics

Western Scheldt Tunnel

The Western Scheldt Tunnel is a 6.6-kilometer road tunnel beneath the Western Scheldt estuary, connecting Zeelandic Flanders with the rest of Zeeland. Opened in 2003, it provides a permanent crossing for regional traffic and remains the longest road tunnel in the Netherlands.

Rijkswaterstaat, Croonwolter&dros

Government buildings
Renovation Ministry of Finance - Relatics project
Flag The Netherlands - Relatics

Renovation Ministry of Finance

The Renovation of the Ministry of Finance in The Hague was a project aimed at giving the existing ministry building a much-needed major upgrade. This renovation was needed to solve issues like old installation techniques, lack of isolation, and outdated furnishings.

Central Government Real Estate Agency, Safire (Strukton, Burgers Ergon, GTI, ISS Facility Services)

Relatics - Pioneers in Systems Engineering

Pioneers in Systems Engineering
Insights and lessons learned from construction industry professionals.