Projects supported by Relatics
Relatics supports projects of any size or complexity through all phases, serving a wide variety of sectors and regions.
Projects that use Relatics
With over 20 years of experience, Relatics has become the leading Systems Engineering software tool for the construction industry, for both clients, contractors and engineering firms. Hundreds of projects worldwide have been successfully delivered with the support of Relatics.
From civil infrastructure to buildings, energy and industrial facilities, Relatics plays a crucial role in a wide range of prestigious projects. Below is a selection of the projects Relatics has been used on.

Sunrise Wind Offshore Wind Farm
Sunrise Wind is a large offshore wind farm being developed off the coast of New York. Located about 30 miles east of Montauk, the project will supply clean energy to hundreds of thousands of homes. Construction is underway, with operations expected to begin in 2027.
Boskalis

Fehmarnbelt Fixed Link
The Fehmarnbelt Fixed Link is an under-construction immersed tunnel, connecting Lolland in Denmark with Fehmarn in Germany, across the 18-kilometer wide Fehmarn Belt in the Baltic Sea. Once completed it will be the world’s longest immersed road and rail tunnel.
Femern A/S, Fehmarn Belt Contractors (FBC), Fehmarn Link Contractors (FLC)

Fraser River Tunnel
The new eight-lane Fraser River Tunnel will replace the current four-lane George Massey Tunnel, doubling traffic capacity. The new tunnel is designed to be earthquake-resistant, a crucial feature for a future-ready, resilient connection across the region.
Arcadis

Grand Paris Express
The Grand Paris Express is a large-scale metro expansion in Paris, adding 200 kilometers of new lines and 68 stations across the metropolitan region. The project will significantly improve connectivity between the city and its suburbs, supporting urban growth and mobility.
VINCI

Marinus Link
The Marinus Link is a high-voltage electricity interconnector under construction between Tasmania and mainland Australia. It aims to enhance energy security, integrate renewables, and support the transition to a reliable, low-carbon power system.
Marinus Link Pty Ltd

Tiel-Waardenburg dike reinforcement
Part of the Flood Protection Program, the Tiel-Waardenburg dike reinforcement strengthens flood defenses along the river Waal. The project upgrades the dike to meet modern safety standards and better protect surrounding communities from flooding.
Dura Vermeer

Revolution Wind Offshore Wind Farm
Revolution Wind is a 704 MW offshore wind farm under construction around 15 nautical miles off Rhode Island. Developed by Ørsted and Skyborn, it will deliver 400 MW to Rhode Island and 304 MW to Connecticut; enough to power over 350,000 homes.
Boskalis

Rotterdam NH3 Terminal
The Rotterdam Ammonia (NH3) Terminal enables large-scale import, storage, and distribution of renewable ammonia. The facility supports Europe’s energy transition as a key hub for clean hydrogen and accelerates industrial and transport decarbonization.
Dura Vermeer

West Bridge Bearing Refurbishment
The West Bridge is part of the Great Belt Bridge road link across Storebælt. The road bridge is 6.6 kilometers long and runs parallel to the railway bridge. The project involves refurbishing and partially replacing around 170 bearings to ensure long-term durability.
Sund & Bælt

Pasay Reclamation Development Project
Reclamation works for the Pasay Reclamation Development Project in Manila Bay are creating several artificial islands, around 360 hectares of new land in total, to host a mixed-use waterfront city with housing, commerce, tourism and green spaces.
Boskalis

Krammer Locks
The Krammer Locks renovation is a large-scale infrastructure project within the Dutch Delta Works to modernize a vital inland shipping route. The project includes lock upgrades, modernized control systems, and multidisciplinary systems integration.
ZEEKR (BESIX, BESIX Unitec, Croonwolter&dros, Demako, Iemants, Bosch Rexroth)

Borkum Riffgrund & Gode Wind 3
Construction of the Borkum Riffgrund 3 and Gode Wind 3 offshore wind farms involved installing monopile foundations and inter-array cabling in the German North Sea, enabling turbine connections and delivering over one gigawatt of renewable energy.
Boskalis

IJmuiden Ver Beta (2GW)
IJmuiden Ver Beta is a major offshore wind project located far off the Dutch coast, set to harness the strong North Sea winds. It supports the Netherlands’ growing ambition to lead Europe in offshore wind energy and further boost energy independence.
TenneT, NKT, GE Vernova/Seatrium

FSRU jetty Wilhelmshaven
The construction of the Floating Storage and Regasification Unit (FSRU) jetty at Wilhelmshaven involved installing monopiles and a dredged berth and turning basin, enabling LNG carriers to dock safely and deliver regasified gas into Germany’s energy network.
Van Oord

Guyana Gas to Energy
The gas-to-energy project in Guyana includes the offshore installation of approximately 190 kilometres of natural gas pipeline in water depths up to 1,400 metres, and associated subsea infrastructure, enabling efficient transport of natural gas to shore.
Van Oord

Zaanstad Judicial Complex
The Zaanstad Judicial Complex is a prison in Westzaan, the Netherlands, replacing older prisons in the region. As the country’s largest correctional facility, it accommodates over 1,000 inmates and includes a Penitentiary Psychiatric Centre and remand prison.
Central Government Real Estate Agency, Pi2 (Ballast Nedam, Imtech)

Baltic Eagle Offshore Wind Farm
The Baltic Eagle offshore wind farm, developed by Iberdrola and Masdar, has a capacity of 476 MW spread over 50 turbines. Located about 30 km northeast of Rügen in the German Baltic Sea, it will generate roughly 1.9 TWh/year, powering ~475,000 households.
Van Oord

Sofia Offshore Wind Farm
The Sofia Offshore Wind Farm is a 1.4 GW project developed by RWE on Dogger Bank, 195 km off the UK’s northeast coast. Featuring 100 14 MW turbines, the wind farm will generate enough renewable energy to power approximately 1.2 million average UK households.
Van Oord

Rotterdam World Gateway
The Rotterdam World Gateway is a new container terminal located at the Prinses Amalia Port at the Tweede Maasvlakte near Rotterdam. The terminal ensures a seamless, largely automated transit from anywhere in the world to the European hinterland.
Rotterdam World Gateway

Togo – Benin Coastal Protection
The cross-border coastal protection project in Togo and Benin protects about 40 km of shoreline between Agbodrafo (Togo) and Grand-Popo (Benin). It builds groynes, restores dunes and wetlands, and uses a 6.4 million m³ “sand motor” to naturally replenish beaches.
Boskalis

Baltica 2 Offshore Wind Farm
Baltica 2 is a 1.5 GW offshore wind farm being built about 40 km off Poland’s Baltic coast by PGE Polska Grupa Energetyczna and Ørsted. It will include 107 offshore wind turbines and four substations, and is expected to start generating green power by 2027.
Boskalis

IJmuiden Ver Alpha (2GW)
IJmuiden Ver Alpha is the first of the IJmuiden Ver wind farms, paving the way for large-scale offshore renewable energy production. It marks a key step forward in the Netherlands’ transition to a cleaner, more resilient national energy system.
TenneT, Prysmian/DEME, Dura Vermeer, Larsen & Toubro/Hitachi Energy

M42 junction 6
The M42 junction 6 scheme aims to ease congestion around Birmingham Airport. The project includes a new 2.4 km dual link road, two roundabouts on either side of the highway, a new junction on the M42, and a new overbridge for cyclists and pedestrians.
Skanska UK

Renovation Ministry of Finance
The Renovation of the Ministry of Finance in The Hague was a project aimed at giving the existing ministry building a much-needed major upgrade. This renovation was needed to solve issues like old installation techniques, lack of isolation, and outdated furnishings.
Central Government Real Estate Agency, Safire (Strukton, Burgers Ergon, GTI, ISS Facility Services)

HumeLink West
HumeLink is one of New South Wales’ largest electricity transmission projects, delivering 365 km of new high-voltage lines connecting Wagga Wagga, Bannaby and Maragle. The project will strengthen grid reliability and increase renewable energy capacity across the region.
CPB Contractors, UGL

Metro North Brussels
The Metro North Brussels project extends Metro Line 3 by 4.36 kilometers, adding seven new stations and a new depot. Construction is complex, with tunnelling through densely built areas while existing rail operations must continue throughout the project.
Sweco Belgium

Brunsbüttel’s fifth lock chamber
The Brunsbüttel lock complex on the Kiel Canal is being expanded with a new fifth lock chamber, enabling much-needed maintenance of the existing 100-year-old chambers. At 330 meters long and 42 meters wide, the new chamber can accommodate larger ships.
ARGE BBS5

A428 Black Cat to Caxton Gibbet Improvements
The A428 Black Cat to Caxton Gibbet project will create a new 16 km dual roadway, replacing the existing single roadway. Three new junctions, a 200-meter viaduct, and a flyover will improve traffic flow between Milton Keynes and Cambridge.
Skanska UK

Amsterdam Airport Schiphol Terminal
The Amsterdam Airport Schiphol Terminal expanded airport capacity and improved passenger experience. By adding an innovative terminal, improving passenger flows, and integrating new security systems, Schiphol is better equipped to handle growing traveller numbers.
SNBV (Schiphol Nederland B.V.), KLAIR (KAAN Architecten, Estudio Lamela, ABT, Ineco)

Brussels Airport
Brussels Airport’s expansion will transform the airport into a modern, multimodal hub. The project includes enlarged departure and arrival halls, a new hotel, green boulevard and intermodal hub, bringing transport modes together while improving passenger experience.
Witteveen+Bos

Rail Baltica Riga Central Station
The Rail Baltica Central Station in Riga is a new station for Rail Baltica, a large-scale infrastructure project integrating the Baltic States into the European rail network. The project also includes a railway bridge over the river, with associated embankment and track works.
BESIX

Nordhavn Tunnel
The Nordhavn tunnel is a 1.4 km cut-and-cover road tunnel in Copenhagen leading to Nordhavn. It connects the developing urban areas of outer and inner Nordhavn to the city and port areas. Additionally, the tunnel is expected to ease traffic on other roads.
BESIX

Sluishuis
The Sluishuis in Amsterdam, the Netherlands is a residential living complex on the edge of the Amsterdam waterfront. The project contains 442 energy-neutral, rental and owner-occupied apartments, houseboat plots, jetties for pleasure boats, and commercial spaces.
BESIX

Crown Princess Mary Bridge
The Crown Princess Mary Bridge is a 1.4-kilometer bridge south of Frederikssund, crossing the Roskilde Fjord. The four-lane expressway will help ease traffic congestion in the region. As the project is in an EU Natura 2000 zone, it was subject to strict environmental requirements.
BESIX

DolWin
The DolWin project is a major offshore grid connection system in the North Sea, transmitting renewable wind energy to the German mainland via high-voltage direct current (HVDC) technology, ensuring reliable, efficient, and sustainable electricity supply.
TenneT, Boskalis

Meandering Meuse
The Meandering Meuse is a large-scale flood protection and river restoration project in the Netherlands. It combines flood barrier reinforcements with river widening, nature development and recreational improvements to enhance flood safety.
Boskalis

Sif monopile factory
Sif’s fully automated monopile foundation factory at the Tweede Maasvlakte in Rotterdam can produce up to 200 large-diameter monopiles annually. The facility supports the offshore wind industry and strengthens the Netherlands’ position in the renewable energy sector.
Sif Group

Port of Neom (Oxagon City)
The Port of NEOM is aimed to be the world’s most technologically advanced, efficient, and sustainable port. Located in the north-west of Saudi-Arabia on the Red Sea, the port is situated at the crossroads of the world between Africa and Asia.
Boskalis, BESIX

Western Sydney Airport metro Line
The Western Sydney Airport railway will provide an important connection between the new Western Sydney International Airport and the surrounding region. Spanning 23 kilometers, this new rail line directly links local communities to major job hubs.
CPB Contractors

Zonnestroom 3
Vitens’ Zonnestroom 3 project, in collaboration with Generation Green, installs solar panels on up to 166 of their rooftops to supply green energy for their own operations. It aims to cut 2–5 kt CO₂ annually, protect nature, and add EV charging.
Vitens

Ostwind 4 (2GW)
The Ostwind 4 project is a 2 GW offshore grid connection in the German Baltic Sea near Rügen. Scheduled for completion by 2031, its new 110 km HVDC cable will transmit renewable power, supplying electricity to nearly two million households.
50Hertz, GE Vernova, Drydocks World

M2 Metro Line Tel Aviv
The M2 Metro Line in Tel Aviv links Yafo with Rosh Ha’ayin, operating along a line of 26 kilometers with 22 stations. Once completed, this metro line will ease congestion on the region’s busy roads and benefit Israel’s wider infrastructure as a result.
Dan Rail (WSP, Ackerstein, Decker Engineering)

North East Link – South
The North East Link – South project includes 6.5 kilometers of tunnels underneath Melbourne. Connecting Watsonia to Bulleen, the project will fix the critical missing link in the city’s freeway network. The Link is expected to become fully operational in 2028.
Nexus (Laing O’Rourke, Symal Group, WSP, Arcadis)

Princess Elisabeth Energy Island
The island is located off the Belgian coast in the North Sea, stretching across 6 hectares. It is the world’s first artificial energy island, and will serve as an electricity hub bundling together cables leading to wind farms in Belgium’s second offshore wind zone.
Jan De Nul

Kalvebod Overhaul Track
The Kalvebod Overhaul track is a project that aims to establish two new passing tracks at Kalvebod. They are meant to improve overall train traffic, ensuring that capacity is sufficient for increased railway traffic from the upcoming Fehmarn Belt connection.
Sund & Bælt

Øresund Motorway expansion
The Oresund motorway is a 9 km long road, which was constructed as an extension to the E20 motorway from Vestamager to the Oresund link’s tunnel. Despite the relatively short distance, it is one of the most important traffic connections in Denmark.
Sund & Bælt

Eindhoven Airport terminal expansion
The Eindhoven Airport terminal expansion increases capacity and passenger experience with modern facilities, sustainable design, and improved efficiency. The development supports regional growth and strengthens the airport’s role as a key mobility hub.
Heijmans

Ilot Charles III
The project Ilot Charles III focuses on major urban redevelopment at a former industrial/railway site in Monaco. It will combine underground services with a range of above-ground functions to create a new modern city hub.
Egis

Gadigal Station
The Gadigal railway station is an underground Sydney Metro station located in the central business district of the city. The station serves the Metro North West & Bankstown Line, with frequent services operating between Sydenham and Tallawong.
CPB Contractors

Nederwiek 1 (2GW)
Nederwiek 1 is a large offshore wind farm off the Dutch coast, designed to supply reliable clean power to millions of homes. It’s an important part of the Netherlands’ ongoing push to accelerate renewable energy production and cut carbon emissions by 2030.
TenneT, Prysmian/DEME, Antea Group, Dura Vermeer

Scheldt Bridge Antwerp
The Scheldebrug, or Schelde Cycle Bridge, is a planned pedestrian and cycle bridge over the River Scheldt in Antwerp, near the Kennedytunnel along the FR10 cycle highway. It’s part of De Grote Verbinding, a major project to complete Antwerp’s Ring for both cars and cyclists.
De Vlaamse Waterweg nv, SBE

APM Terminals Maasvlakte II extension
The APM Terminals Maasvlakte II extension project is a major infrastructure initiative in the Port of Rotterdam. It is aimed at doubling the terminal’s capacity and transforming it into one of the most advanced, efficient, and sustainable container terminals in the world.
APM Terminals, Port of Rotterdam, Dura Vermeer

Ontario Line
The Ontario Line will be a 15.6 kilometre subway line that will make travel within Toronto and beyond easier and faster. The line will bring 15 new stations to the city, running from Exhibition Place to the Eglinton Crosstown LRT through downtown.
Infrastructure Ontario, Metrolinx, Strabag

Bogotá Metro Línea 1
Bogotá Metro Línea 1 is the long-awaited first line of the Bogotá Metro. The metro line will be almost 24 kilometers long, elevated on a viaduct, fully automatic, and driverless. The line is expected to accommodate over 1 million passengers every day.
Metro de Bogotá, WSP Colombia

New Lock Terneuzen
The project involved constructing a new lock in a major international waterway. Since the existing locks caused a bottleneck for shipping between Western Scheldt and the Ghent-Terneuzen Canal, the new lock improves accessibility of the Ghent and Terneuzen ports.
Vlaams-Nederlandse Scheldecommissie, Sassevaart (BAM, DEME, Van Laere)

E4 Stockholm Bypass
The E4 Stockholm Bypass is a new section of the E4 highway routing traffic around the Swedish capital. It connects northern and southern Stockholm, ease congestion on main roads and the city centre, and make the region’s traffic network more resilient.
Trafikverket, Bravida

Gotthard Base Tunnel
The Gotthard Base Tunnel is a railway tunnel in Switzerland running deep beneath the Gotthard massif of the Swiss Alps. The route runs from north to south, from near Erstfeld to Bodio. At 57 kilometers, it is the longest railway tunnel in the world.
AlpTransit Gotthard AG, ARGE Fahrbahn Transtec Gotthard

The Afsluitdijk
The Afsluitdijk renovation strengthens the iconic Dutch water barrier to meet future flood protection standards. It includes reinforcing the dike, improving drainage, and upgrading locks and sluices, while preserving its important role in Dutch water management.
Rijkswaterstaat, Levvel (BAM, Van Oord, Rebel, Invesis)

Oosterweel Link
The Oosterweel Link is a large-scale infrastructure project in Antwerp to complete the R1 Ring Road on the northern side. The project includes a new Scheldt tunnel for motorized and bicycle traffic, a stacked canal tunnel, and an embedded, partially covered highway.
Lantis, Rinkoniên, COTU, ROCO, OCOTECH

Renovation Binnenhof
The Binnenhof Renovation aims to modernize the Netherlands’ national government complex. The renovation will preserve 800 years of cultural heritage, whilst improving the Binnenhof as a sustainable and modern working environment for its users.
Central Government Real Estate Agency

PALLAS Reactor
The PALLAS Reactor project is a tank-in-pool research reactor replacing the existing High Flux Reactor (HFR) in Petten, the Netherlands. It ensures the future supply of medical isotopes, supports nuclear research, and strengthens the Dutch nuclear expertise base.
NRG PALLAS, FCC Construcción

National Military Museum Soesterberg
The National Military Museum showcases Dutch military history and is located on a historic military air base. The project aims to invest in nature development, while ensuring that the area’s recreational use does not compromise its natural value and ecosystem.
Central Government Real Estate Agency, Heijmans

Nyt Aalborg Universitetshospital
The Nyt Aalborg Universitetshospital was a major healthcare infrastructure and urban development project in Denmark. The project brought together multiple functions, formerly spread across locations, into a single site with 7 interconnected buildings.
Nyt Aalborg Universitetshospital

Sydney Metro
The Sydney Metro project is one of the world’s largest urban rail infrastructure projects. It delivers 4 metro lines and 46 stations across 113 kilometers of railway by 2030. The Sydney Metro is considered Sydney’s most transformative transport investment in a century.
NSW Government, Systems Connect (CPB, UGL)

High Speed 2
High Speed 2 is UK’s largest infrastructure project, improving connectivity between London, the Midlands, and North of England. It aims to increase rail capacity, reduce journey times, free up existing lines for freight and local services, and support regional development.
High Speed 2 Ltd.

Second Coen Tunnel
The Second Coen Tunnel expanded the A10 motorway beneath the North Sea Canal to improve access and reduce congestion in Amsterdam. It combined a new five-lane immersed tunnel with renovation of the original tunnel, creating a safer and more reliable connection.
Rijkswaterstaat, Coentunnel Company (VINCI, CFE, DEME, BESIX, Dura Vermeer, TBI, Arcadis)

City Bridge Nijmegen
City Bridge Nijmegen, known as De Oversteek, is a 1.2-kilometre bridge across the river Waal. It provides an important connection between Nijmegen and the Waalsprong district, improving traffic distribution while offering dedicated space for cyclists and pedestrians.
Municipality of Nijmegen, BAM, Max Bögl

A15 Maasvlakte – Vaanplein
The A15 Maasvlakte – Vaanplein project expanded and upgraded 37 kilometres of motorway between the Port of Rotterdam and Vaanplein. The works added road capacity, improved junctions and traffic systems, and delivered the new Botlek Bridge.
Rijkswaterstaat, A-Lanes A15 (Ballast Nedam, John Laing, STRABAG, Strukton)

Port extension Maasvlakte 2
Maasvlakte 2 expanded the Port of Rotterdam into the North Sea, creating 2,000 hectares for port-related industry and logistics. The project comprised land reclamation, sea defences, port basins, quay walls, and transport infrastructure.
Port of Rotterdam, PUMA (Boskalis, Van Oord)

Western Scheldt Tunnel
The Western Scheldt Tunnel is a 6.6-kilometer road tunnel beneath the Western Scheldt estuary, connecting Zeelandic Flanders with the rest of Zeeland. Opened in 2003, it provides a permanent crossing for regional traffic and remains the longest road tunnel in the Netherlands.
Rijkswaterstaat, Croonwolter&dros
Case study
Relatics as Model-Based Systems Engineering backbone
The energy transition places unprecedented demands on infrastructure owners, and TenneT’s 2GW Program is one of Europe’s most ambitious examples. In this case study, you will learn how Relatics supports TenneT in navigating this complexity, ensuring standardization, transparency, and traceability throughout the program.